Under the Hollywood stars

Recently, our diversification strategy has  led us to explore new market areas and launch new activities in the railway sector. Due to the many decades experience in the long-distance trains maintenance, Talgo was assigned the overall remodeling of the significant part of the LA metro fleet, USA.

LA city intense traffic is one of the most notorious in the US for its legendary jams. This is why the underground railroad in the center of the great metropolis performs as a strategically attractive, alternative transportation means, capable to efficiently reduce the city´s traffic and keep the huge urban city in motion. Trains´ intensive usage allows to suspend metro services for only a few hours per day.

Currently, the Los Angeles County Metropolitan Transportation Authority (LACMTA) is in charge of a highly diverse fleet, made up of the rolling stock of four railway manufacturers, including both light rail and conventional trains.  In pursuit of the ambitious plan, which is to ensure the reliable and uninterrupted 365 days-per-year operation, LACMTA has developed a modernization program, in which Talgo will have the leading role.

Maximum efficiency

After a more than 25-year-long operation, the A650 metro fleet faces the most common difficulties resultant from its intensive and almost non-stop use: wear and technological obsolescence. Talgo´s task in this case consists in breathing new life into railway vehicles, making them reliable, safe and up-to-date.

  • Under these premises the overall remodeling of the 74 units model A650, built between 1992 and 2000 and currently operating on the Red line, will be carried out.
  • Trains´ most critical components will be overhauled or replaced: traction and braking systems, signaling and communication equipment, etc.
  •  For the moment, works on the at least 38 units will be performed by Talgo, and, further on, probably, on the other 36.
  • Under this contract Talgo will upgrade up to 70% of the LA Red line metro fleet.

Activities diversification and company´s internationalization

This new project proves Talgo´s capacity to successfully keep up to the world´s most competitive markets, and shows its strategy based on geographical and commercial diversification, since the LA metro is the first Talgo´s project related to the urban rolling stock.

  • Many decades of experience in maintenance and overhaul works.
  • 100% of the projects, carried out within the set time and budget frameworks.
  • First step in the urban transport segment.
  • Opportunity to open a new market for the maintenance equipment commercialization.

Localization plan

Building on its broad experience on the US market which dates back to the mid 90´s, Talgo will develop its own procurement strategy, purchasing all goods and services from local suppliers and contracting the US workforce in order to meet the Buy America program requirements and guarantee maximum service quality.

  • Works will be carried out in the Los Angeles facilities and at Talgo´s plant in Miwaukee (Wisconsin), their duration will be around two years.
  • The assignment of this project took place after more than a year-long negotiations with local suppliers.
  • Talgo will perform diverse tasks, including both the installation of the new systems and the improvement of the existing ones.
  • And all that in full compliance with the Buy America plan, as in the previous projects developed by Talgo in the USA.

Travel routes